Tests
Find the Right Test for Your Requirements
Explore our comprehensive testing portfolio and find the right test for your specific needs — with tailor-made testing solutions, traceable results, and full transparency.
22918 Products
Pull-Apart Effort / RT - after External Chemical and Environmental Resistance
SAE J 2044 7.3.14 / 6.3
Pull-out force from the insulation displacement connection (only in connection with insulation
GS 95006-7-1 PG 10 (03) E 10.2
Pull-out force from the insulation displacement connection (only in connection with insulation
GS 95031 - PG 10 (03) E 10.2
Pull-out force from the insulation displacement connection (only in connection with insulation
LV 215-2 PG 10_1 (02) E 10.1
Pull-out force from the insulation displacement connection (only in connection with insulation)
LV 214 PG 10_1 (02) E 10.2
Pull-out force from the insulation displacement connection (only in connection with insulation)
VW 75174 - PG10_1 (03) E 10.2
Your Direct Contact
Questions About OurTests?
Let’s talk about your specific testing requirements.
Get in Touch →